Our Installation

As established installers Infinity Environmental Limited are trusted by hundreds of customers in wastewater management, to make us Hoxne leading sewage treatment plant installers. From simple repair to complete new package sewage treatment plant installation our design service is bespoke to your project requirements. We can recommend the best products on the market being independent installers we are not tied to any one manufacture and therefor offer the most competitive price on the market.

Our free site visit is available for all new sewage treatment plant systems in Hoxne offering comprehensive written quotation for the best-off mains drainage solution available to you. If you are looking for independent installer of package sewage treatment plants in Hoxne, please call the specialists on 01206 890222 or take further look at our case study below for a sewage treatment plant installation we have undertaken.

preparing works for sewage treatment plant installation in suffolk

Domestic Package Sewage Treatment Plants.

All sewage treatment plants are based on the same principle: to create the right environment for aerobic bacteria to be produced. The addition or presence of air creates microorganisms to break down the sewage, with various treatment and settlement zones. The effluent quality from most leading manufacturers is 95% or above clean water through the various stages of sewage treatment. The effluent from sewage treatment plant can discharge to watercourse if compliant to Environment Agency requirements or discharge can be made by soakaway if ground conditions are suitable.

Key Benefits

  • EN12566 – 3 tested to the latest standard.
  • Below ground installation.
  • Low energy consumption.
  • No odour produced.
  • Extended soakaway lifespan.

  • Low maintenance costs.
  • Optional invert depths.
  • Pumped outlet options available.
  • Minimal visual impact.
  • Discharge to suitable watercourse.

Case Study

Our customer was recommended by a neighbour we had previously undertaken similar works for new sewage treatment plant installation. We looked at all options to repair existing septic tank to resolve their septic tank problems but replacement drainage system was needed, due to existing septic tank beyond repair. The property was located in Hoxne surrounded by farm land with good access to the property for excavator and package sewage treatment plant we could offer cost effective solution. The clay ground conditions commonly found in some parts of Suffolk made the preferred choice of package sewage treatment plant and discharge to the ditch our only option. We liaised with Environment Agency for discharge consent to the ditch on the customer’s behalf and all other local authorities throughout package sewage treatment plant installation.

sewage treatment plant delivered for installation
Date
20th June 2016
Location
Hoxne
Ground Conditions
Clay
Type
Package Sewage treatment plant Installation & discharge to ditch
Product
Conder ASP 6 Package Sewage Treatment Plant
Population
6 People

  • Several trail holes were dug to locate the heat source pipework buried in the back garden and water main at front of the property. When located, we could commence works due to all other services being overhead.
  • There were several incoming wastewater connections to connect and divert to new sewage treatment plant. Rotating laser level was used throughout installation to work out invert depth of the new incoming drain run.
  • The depth of the package sewage treatment plant excavation was worked out from the drain run depth. The Conder ASP 6 population sewage treatment plant excavation was sized in accordance to the manufactures specification.
  • Concrete was poured onto membrane at the front of the property and transported to the excavation by dumper. Concrete base was levelled to sit the new sewage treatment plant with concrete backfill surrounding the tank.
  • New drain run connections were made to divert from existing drainage system to the new sewage treatment plant. Each connection took no longer than 30 minutes to connect causing minimal disturbance to the customer.
  • On completion, all excavations were backfilled leaving the back garden neat and tidy with a seeded finish.

waste water redirected to sewage treatment plant
sewage treatment plant being lowered into excavation
sewage treatment plant transported by excavator to the back garden
sewage treatment plant installed with concrete backfill
excavation for sewage treatment plant installation
sewage treatment plant commissioned and fully operational

On completion, all pipework was air tested, electric connection was made by our fully qualified electrician, and sewage treatment plant was commissioned. Local building inspector checked the completed sewage treatment plant installation and signed off works to obtain ‘Completion of Works Certificate’. The building control certificate offers reassurance the works we carry out are compliant to the latest building regulation and for future reference.

Get In Touch!

Request a FREE quote or site survey using the form below. Please include what the job entails and attach any supporting images that may help us estimate the job.

  • Call Us

    Feel free to call us on 01206 890222,
    Monday - Friday, 9am - 5pm

  • Send an Email

    You can email info@infinityenvironmental.co.uk and we'll get back to you soon.

Request a Quote

Attach File
  • Call Us

    Feel free to call us on 01206 890222,
    Monday - Friday, 9am - 5pm

  • Send an Email

    You can email info@infinityenvironmental.co.uk and we'll get back to you soon.

Request a Site Survey

Attach File

Specialists in sewage treatment plant installations for domestic & commercial properties covering Hoxne and surrounding towns.

Get a Site Survey